Products
See the calculation formula, fees, and sample transactions to understand potential profit and loss.
[ (Selling Price – Buying Price) x Contract Size x n Lot ] – [ (Facility Fee + VAT) x n Lot ]
| Contract | Fee per Night |
|---|---|
| HKK5U and HKK50 | US $3 / night |
| JPK5U and JPK50 | US $2 / night |
| XULF and XUL10 | US $5 / night |
A client opens a buy position on HKK5U at 24,600 points for 2 lots, then closes the 2-lot buy position when the index reaches 24,700 points.
An investor expects the Hang Seng Index to strengthen and opens a buy position on HKK5U at 24,600 points for 1 lot. The forecast is wrong and the position is closed at 24,550 points.
An investor expects the Nikkei 225 to weaken and on June 10 opens a sell position at 14,850 points for 2 lots. Two days later (June 12), the investor closes the 2-lot sell position when the index is at 14,650 points.
| Contract Code | Underlying | Rates Category | Contract Type |
|---|---|---|---|
| GU1010_BBJ | GBP/USD | DIRECT | Daily Rolling Spot Contract of Great Britain Pound Sterling (GBP) against US Dollar (USD) |
| EU1010_BBJ | EUR/USD | DIRECT | Daily Rolling Spot Contract of Euro (EUR) against US Dollar (USD) |
| AU1010_BBJ | AUD/USD | DIRECT | Daily Rolling Spot Contract of Australian Dollar (AUD) against US Dollar (USD) |
| UC1010_BBJ | USD/CHF | INDIRECT | Daily Rolling Spot Contract of US Dollar (USD) against Swiss Franc (CHF) |
| UJ1010_BBJ | USD/JPY | INDIRECT | Daily Rolling Spot Contract of US Dollar (USD) against Japanese Yen (JPY) |
A client buys EU1010_BBJ at 1.3530 for 2 lots, then sells at 1.3540. If the price falls to 1.3525 instead, the position is at a loss.
A client sells UJ1010_BBJ at 102.20 for 1 lot, then closes at 102.12. If the price rises to 102.27 instead, the position is at a loss.